Demolition work and temporary support of the entire church roof so fire-damage repairs could be carried out.
The project
After a church fire in North York, the work called for demolition and temporary support of the roof while repairs were made.
Our scope
Demolition for restoration
Temporary support of the entire roof
Access for roof repairs
Inside the structural work
The photos document the cleared interior, shoring materials and rows of adjustable supports beneath timber members. They show the scale of the temporary roof-support work.
Adjustable steel shoring posts and timber members staged inside the North York church. These materials were prepared for the temporary roof-support work following the fire.The cleared church interior with roof joists, timber members and steel framing exposed. This view documents the structure before the full temporary shoring arrangement was installed.The crew working from scaffold platforms as roof-support members are positioned. Adjustable shoring posts are visible beneath the structure as the support installation progresses.Rows of adjustable steel posts supporting timber members beneath the church roof. The temporary shoring allowed roof repairs to proceed as part of the fire-restoration work.Wide view of the installed roof-shoring arrangement across the church interior. Repeated lines of steel posts and timber members show the extent of temporary support provided for the repairs.