← All projectsMilton, Ontario
Kitchen & living room wall removal
Main-floor demolition and removal of the load-bearing wall between the kitchen and living room, with steel beam installation to open the space.

The project
The original layout separated the kitchen from the living room. Our work included demolition across the main floor and the structural opening between these rooms.
Our scope
- Main-floor demolition
- Load-bearing wall removal
- Steel beam installation
Inside the structural work
The site photos show the exposed floor framing, temporary timber support, material lifts and steel beam installation. They document the structural stage before finishes.




From the job site
Visual site walkthroughs, presented without audio.
Related services
Tell us what you want to open up.
Send your city, photos, approximate opening width and any available drawings. We’ll discuss the structural work and prepare a project-specific scope.
Request a project quote ↗Call 416-875-2363